Our Services

Online Courses

Industry-focused online courses designed for engineers, students, and professionals.
Learn practical skills through structured lessons and real-world applications.


DWG Drawing Sales
High-quality AutoCAD DWG drawings including planning, structural, and working drawings.
Professionally prepared, easy to edit, and ready for immediate use.

Excel Tools & Templates
Advanced Excel tools for estimation, quantity take-off, and cost calculation.
Built to improve accuracy, efficiency, and workflow productivity.

Support & Community
Reliable post-purchase support, regular updates, and access to our professional learning community.

Why Choose DevDrafts
  • Practical, job-oriented learning
  • Ready-to-use professional resources
  • Affordable and transparent pricing
  • Dedicated technical support

Footer – Community
  • WhatsApp Learning Community
  • Telegram Updates Channel
Edit Template

🏭 Industrial Building Rules – Tamil Nadu (G.O.Ms.No.153)

Industrial Building Rules

Industrial Building என்றால் என்ன?

Industrial Building என்றால்
👉 Factory, Manufacturing Unit, Workshop, Processing Unit, Warehouse (Industry related)
போன்ற உற்பத்தி சார்ந்த கட்டிடங்களை குறிக்கும்.

இவை Residential / Commercial buildings-லிருந்து முற்றிலும் வேறுபட்ட விதிமுறைகளுடன் கட்டப்பட வேண்டும்.


📜 G.O.(Ms.) No.153 – ஏன் முக்கியம்?

Tamil Nadu Government வெளியிட்ட G.O.(Ms.) No.153 (07.10.2025) மூலம்
👉 Industrial Buildings-க்கு தேவையான

 

    • Setback

    • FSI / FAR

    • Height

    • Fire Safety

    • Parking

    • Mezzanine Floor rules

எல்லாம் தெளிவாக வரையறுக்கப்பட்டுள்ளன.


📐 Setback Rules (Open Space)

Industrial Building கட்டும்போது:

 

    • Front setback – Road side safety & movement

    • Side setback – Ventilation & fire access

    • Rear setback – Light & air circulation

👉 Fire tender (fire engine) உள்ளே வரக்கூடிய space mandatory.


📏 FSI / FAR (Floor Space Index)

 

    • Industrial Building-க்கு separate FSI norms உண்டு

    • Production area, office, utility area
      👉 எல்லாமே FSI-க்குள் count ஆகும்


🧱 Built-up Area என்றால்?

Built-up area-ல் சேரும் பகுதிகள்:

 

    • Factory shed

    • Production floor

    • Office room

    • Store room

    • Toilet & utility rooms

❌ Open yard, loading open space built-up-ல் count ஆகாது.


🏗️ Mezzanine Floor – Industrial Building-ல்

Mezzanine floor என்பது:

 

    • Ground floor & first floor நடுவில்

    • Partial area மட்டும் கொண்ட floor

Mezzanine floor பயன்பாடுகள்:

 

    • Office cabin

    • Supervisor room

    • Store room

👉 Mezzanine floor FSI-ல் count ஆகும்,
ஆனால் full floor மாதிரி இல்லை.


🔥 Fire Safety விதிமுறைகள்

Industrial Building-க்கு:

 

    • Fire Department approval

    • Fire escape & access road

    • Fire fighting provisions

👉 High-rise industrial building-னா Fire NOC compulsory.


🚗 Parking & Loading Area

 

    • Worker count அடிப்படையில் parking

    • Lorry / goods vehicle movement

    • Loading & unloading space

👉 Planning approval பெற mandatory.


🏭 Other Mandatory Approvals

Industrial Building-க்கு தேவையானவை:

 

    • DTCP / CMDA Planning Approval

    • Fire Department NOC

    • Pollution Control Board (தேவைப்பட்டால்)

    • Factory Inspector approval


🔁 Land Use Conversion

Residential / Agricultural land-ல் industry அமைக்க:
👉 Change of Land Use (CLU / COU) அவசியம்.


✅ Conclusion

G.O.(Ms.) No.153 படி:

Industrial Building கட்டுவது என்றால்
✔ Proper planning
✔ Safety norms
✔ Government approvals
கட்டாயம் பின்பற்ற வேண்டும்.

Source file link 👇

 

Leave a Reply

An online learning platform for Civil Engineers with courses, AutoCAD/DWG files, and estimation Excel sheets

© © 2026 DevDrafts. All Rights Reserved.

Links

AutoCAD DWG Files

Contacts

📍 Address:
38, Sakthi Plaza,
North Street,
Thirukovilur,
Kallakurichi District,
Tamil Nadu – 605757, India

📞 Phone: +91 8667368451
✉️ Email:sp@devdrafts.com suchiprabakaran@gmail.com